Duration Time Scale to Plot on x-Axis

Select the time unit scale to plot on the X-axis for the swimmer plot for the duration of response evaluation.

Available time metrics are listed in the following table:

Time Metric

Function

Days

• Choose this option to measure total duration in days.

Weeks

• Choose this option to measure total duration in weeks.

Months

• Choose this option to measure total duration in months.
• This option is specified by default.

To Specify the Time Scale:

8 Click the appropriate radio button.